Date: 2026-08-05
Present:
- Regina, Andras, Michael M, Michael S, Tomaz, Miklos
Completed action items
-
coext ODF Extensions documentation
-
have the data in online.git dev-notes/ (Michael S)
-
https://github.com/CollaboraOnline/online.mirror/tree/main/dev-notes/odf could be an option (Miklos)
-
Pending action items
Release Engineering update (Andras)
-
Releases
-
COOL 26.04 release red code from the main branch: to be tagged soon
- few patches still waiting in CI
-
co-26.04 branch to be reset to main on Friday, probably
- no need to backport patches just now
-
Patch review (Miklos)
-
- Week 32: 253(+42)
-
-
Week 32: 4(+0)
-
2 of these are valid – Helm chart (Andras)
-
Kendy to migrate the last 2 ones
-
-
-
Top 10 reviewers since last week
- Week 32: Noel Grandin (159), Caolán McNamara (58), Mike Kaganski (22), Miklos Vajna (20), Michael Stahl (17), Tomaž Vajngerl (16), Szymon Kłos (12), Stephan Bergmann (9), Michael Meeks (7), Gökay ŞATIR (4)
incrementalBug reporting
-
- Week 32: 13(+0)
Jenkins / CI update (Adria)
-
Szymon’s monitoring: “last builds” monitoring
-
Week 31: Cypress clean pass: 30%, 419/607 have at least one “retry”
-
Better than last week
-
-
-
Week 32: Success rate is 4%, failed builds are 48/50
-
Week 32: Turnaround time is 2 hr 46 min (median of last 29 SUCCESS/FAILURE builds)
-
pch fix from Noel: https://gerrit.collaboraoffice.com/c/online/+/8654
-
how did we end up here? (Michael M)
-
with incremental builds – old headers still at the old locations (Andras)
- then something broke, and Jenkins ran ‘make clean’ and the next patch failed.
-
Some fixes pushed before the change that it relates to – the reverse case.
-
Fix: the new setup is to not do incremental builds, full builds instead (Andras)
-
PCH and ccache is in use – so hopefully windows builds are fast.
-
We have three windows builder nodes – lets see.
-
-
-
-
New Hardware (Michael M)
-
have 2x new M4 Macs in-hand to setup, and 4 new 1.9Tb SSDs,
-
have a 400 thread machine in process of being ordered, perhaps two.
-
Crash testing (Caolan)
-
2026-07-29: 62 (-6, +13)
- backsliding with apparently old layout issue surfacing after numbering improvements
-
2026-07-22: 55 (-37, +0)
- more good progress
TTT talks
-
Suspended until 4th September
What’s cooking
-
Regina
-
still looking at the SmartArt
-
have updated her document with the new findings
-
having problems with firefox connecting to Nextcloud / staging-perf.eu
-
Chrome works fine, though
-
maybe a cookie problem, clearing them may help (Michael M)
-
-
looking forward to sync with Armin on it
-
-
Miklos
- https://github.com/CollaboraOnline/online/issues/16060 “copy/paste of markdown in the UI”
-
Michael M
-
Review Pranam’s impress patches and merge those …
-
healthcheck and various other patches merged
-
-
Michael S
-
Going back to the ODF notes; github mirror looks good, just one problem
-
tables are narrow and get scrollbars
-
the SDK page did the same but with a better CSS was fixed
-
github page is seemingly not fixable.
-
Maybe github is good enough here.
-
Will look at it (Regina)
-
-
PDF encryption, finding some issues there, especially the PDF 2.0 case
- not the default, and fixing things
-
-
Quikee
-
Progressing with vector rendering
-
svx not to depend on xmloff, so the ODF import/export is not a dependency there
- have some patches to reverse this dependency.
-
-
Andras
- on vaction last week, now wrestling CI.